✦ NEXT-GEN HEAVY INDUSTRY ENTERPRISE ✦

Redefining Steel Manufacturing for the Next Generation

Caprizar Industries Private Limited is engineering an ultra-modern 24,000 MT/Annum integrated High-Frequency ERW welding and hot-dip galvanizing production ecosystem in IDCO Industrial Estate, Khurda, Odisha.

Caprizar NextGen Steel Mill
7.00 ACRE AUTOMATED FACILITY
Khurda, Odisha, India
CIN: U24103OD2025PTC051750
₹47.74 Cr
Total Capital Outlay
24,000 MT
Annual Plant Capacity
7.00 Acres
IDCO Allotted Site
₹224.74 Cr
Full Capacity Sales
✦ CORPORATE OVERVIEW ✦

Institutional Governance & Corporate Profile

Incorporated under the Companies Act, 2013, Caprizar Industries Private Limited combines experienced corporate governance with high-tech steel production engineering.

Statutory Corporate Identity

Company Name:Caprizar Industries Private Limited
Incorporation Date:16 December 2025 (CIN: U24103OD2025PTC051750)
Tax Credentials:PAN: AANCC3504B | TAN: BBNC03769D
Registered Office:Patharmunda, Kaniha, Talcher, Angul – 759117, Odisha
Plant Location:IDCO Industrial Estate, Haladipada, Khurda, Odisha
Caprizar Official Letterhead Preview
✦ BOARD OF DIRECTORS & EXECUTIVE STAFF ✦

Promoter Directors & Plant Management Staff

Led by seasoned industrialists, engineering professionals, and statutory administrators overseeing 252 plant personnel.

Caprizar Executive Boardroom

252 Direct Employment Personnel Breakdown

  • 👨‍💼 24 Executive & Administrative Staff: Finance, Legal, Sales, Procurement & HR.
  • 👷‍♂️ 228 Plant Operations Workers: ERW mill operators, galvanizing bath technicians, QA lab inspectors, and warehouse staff.
NB

NIRANJAN BISWAL

Executive Director

Directs project execution, banking liaison, and statutory clearances.

MB

MANISHA BEHERA

Managing Director

Leads corporate administration, legal compliance, and vendor partnerships.

SS

SANATAN SAHOO

Chief Executive Officer (CEO)

Directs plant manufacturing operations, ERW mill automation, and quality control.

✦ HIGH-TECH PRODUCT PORTFOLIO ✦

High-Precision Steel Tubes & Sections

Engineered with continuous High-Frequency induction welding and hot-dip zinc coating to international standards (IS 1239 / IS 3589).

12,000 MT / ANNUM CAPACITY

GI Galvanized Iron Tubes

Hot-dip zinc coated steel pipes designed for superior corrosion protection. Essential for drinking water networks under the Jal Jeevan Mission, municipal distribution, and firefighting systems.

100% Annual Sales Revenue:₹129.36 Crore
Specification Standard:IS 1239 (Part 1) / IS 3589
Zinc Coating Bath:360 - 550 g/m² (Hot-Dip Bath @ 450°C)
Galvanized Steel Pipes
12,000 MT / ANNUM CAPACITY

GP Tubes & Hollow Sections

High-strength round, square, and rectangular structural sections used extensively in building scaffolding, industrial roofing sheds, greenhouses, and storage racks.

100% Annual Sales Revenue:₹94.08 Crore
Specification Standard:IS 4923 / IS 1161
Scaffolding Market Usage:50% Usage Share in Infrastructure
GP Steel Warehouse
480 MT / ANNUM RECOVERY

Process Scrap Recycling

Operates at a tight 98% material yield with only 2% process loss (end trimmings). All scrap is bundled and sold to regional steel melting furnaces.

100% Annual Revenue:₹1.30 Crore
Quantity:480 Metric Tons (2% of 24,000 MT input)
Scrap Realization Price:₹27,000 per MT
98%
Material Yield Efficiency
100% eco-friendly industrial steel recycling.
✦ AUTOMATED MANUFACTURING PIPELINE ✦

6-Stage Integrated ERW & Galvanizing Process

Click on any manufacturing stage below to view detailed technical specifications and quality tolerances.

ERW Welding Pipeline

Continuous High-Frequency Induction Line

Seamless seam fusion without filler metal at 400 kHz frequency followed by 450°C hot-dip zinc coating.

01

Coil Slitting

Uncoiling & strip slitting into exact widths.

02

ERW Welding

High-Frequency induction seam welding.

03

Sizing & Cutoff

Outer diameter sizing & flying saw cutoff.

04

Hot-Dip Galvanizing

Pickling & 450°C molten zinc bath coating.

05

QA & Hydro Test

Hydrostatic pressure & eddy current testing.

06

Bundling & Dispatch

Hexagonal bundling & warehouse dispatch.

✦ INFRASTRUCTURE BLUEPRINT ✦

189,818 Sq. Ft. Built-Up Area on 7.00 Acres

Optimized plant engineering layout on IDCO Industrial Estate land in Haladipada, Khurda, Odisha.

7-Acre Industrial Masterplan Blueprint

Site Engineering Specifications

IDCO Estate Allotted Land with 1500 KW grid power, effluent treatment plant, 30,000 sq ft coil storage, and dual factory sheds.

40,000 Sq Ft

GI Factory Shed

Two 200' x 100' bays for ERW mills & zinc bath.

40,000 Sq Ft

GP Factory Shed

Two 200' x 100' bays for high-speed forming mills.

30,000 Sq Ft

Raw Material Storage

Crane-equipped shed for heavy coil stock.

30,000 Sq Ft

Finished Goods Warehouse

Covered warehouse for bundled pipes.

10,000 Sq Ft

Quality Control Lab

Hydrostatic pressure testing station.

39,818 Sq Ft

Office, ETP & Substation

Admin office (8.1k sq ft) & 1500 KW substation.

✦ CAPITAL STRUCTURE & PROJECTIONS ✦

Means of Finance & 5-Year Financial Statements

Robust financial structure with strong debt servicing capability (DSCR 2.77) and low break-even point (22.93%).

Financial Growth Dashboard
34.39% EQUITY
₹16.42 Cr

Promoter contribution.

44.83% DEBT
₹21.40 Cr

Term Loan @ 11% p.a.

20.78% CC
₹9.92 Cr

Working capital CC.

5-Year Projected Financial Statement (₹ Crore)

Financial Metric Year 1 (60%) Year 2 (65%) Year 3 (70%) Year 4 (75%) Year 5 (80%)
Gross Revenue from Sales₹134.84 Cr₹146.08 Cr₹157.32 Cr₹168.55 Cr₹179.79 Cr
Gross Profit₹10.37 Cr₹11.58 Cr₹13.11 Cr₹14.62 Cr₹16.09 Cr
EBITDA₹12.54 Cr₹13.36 Cr₹14.54 Cr₹15.76 Cr₹16.97 Cr
Net Profit After Tax (PAT)₹4.41 Cr₹5.48 Cr₹6.77 Cr₹8.05 Cr₹9.30 Cr
2.77x
Average DSCR
22.93%
Break-Even Point
22.70%
Project IRR
4.58 Yrs
Payback Period
✦ LIVE TERMINAL CALCULATOR ✦

Interactive Financial & ROI Simulator

Adjust operational sliders below to simulate projected annual sales revenue, net profit, monthly loan EMI, and debt service coverage ratio (DSCR).

Terminal Operational Controls

Capacity Utilization Rate 70%
Selling Price Margin Variance 0%
Bank Term Loan Interest Rate 11.0% p.a.

Terminal Output Metrics

ANNUAL REVENUE
₹157.32 Cr
NET PROFIT (PAT)
₹6.77 Cr
MONTHLY LOAN EMI
₹36.64 L/mo
PROJECTED DSCR
2.77x
✦ ROADMAP & POLICY SUBSIDIES ✦

18-Month Timeline & Odisha IPR 2022 Incentives

Factory Shed Construction Timeline

Project Implementation Window

December 2026 to May 2028 execution period with commercial production launch target in June 2028.

18-Month Milestone Schedule

Dec 26 – Jan 27:IDCO Land Acquisition & Statutory Clearances
Feb 27 – May 27:Land Development & Perimeter Wall Construction
Jun 27 – Nov 27:Civil Construction of Factory Sheds & Office
Jul 27 – Dec 27:Machinery Ordering & Procurement
Jan 28 – Mar 28:Equipment Erection & Installation
Mar 28 – Apr 28:Substation & Utility Integration
May 2028:Trial Production Runs & QA Testing
Jun 2028 Onward:COMMERCIAL PRODUCTION LAUNCH

Odisha IPR 2022 Policy Incentives

  • Capital Investment Subsidy: Grant on Plant & Machinery investment.
  • 100% Net SGST Reimbursement: Full Net SGST reimbursement for 7 to 10 years.
  • 100% Stamp Duty Exemption: Exemption on IDCO land lease deed registration.
  • Power Tariff Subsidy: Concessional electricity tariff per unit.
✦ FREQUENTLY ASKED QUESTIONS ✦

Investor & Banker FAQ

Q1: Where do we procure raw steel coils from and what is the scrap recovery? +
HR/CR steel coils are procured directly from Tata Steel, SAIL, and JSW plants in the regional steel belt (Odisha/Jharkhand). Manufacturing process loss is 2% (480 MT scrap sold @ ₹27,000/MT = ₹1.30 Crore / year scrap revenue).
Q2: What is the exact bank loan debt terms and EMI repayment? +
Bank Term loan ₹21.40 Cr @ 11.00% p.a. interest. Monthly EMI is ₹36.64 Lakhs / Month (including principal + interest) over 7 years (84 EMIs). Total interest over 84 months is ₹9.38 Cr. Promoters contribute ₹16.42 Cr equity (34.39%).
Q3: Why Khurda, Odisha as the plant location? +
IDCO allotted 7.00-acre industrial site with direct National Highway connectivity, excellent rail/road logistics, 1500 KW power grid connectivity, and close proximity to regional raw material steel mills.
✦ CONNECT WITH US ✦

Request Quotation & Business Inquiry

Business Inquiry Form

Corporate HQ & Direct Contacts

Registered Office: Caprizar Industries Private Limited, Patharmunda, Kaniha, Talcher, Angul – 759117, Odisha, India.

Plant Site: IDCO Allotted Estate, Haladipada, Khurda, Odisha.

📞 Phone: +91 9438857050 / +91 7438857050
✉ Email: info@caprizar.com | Social: @caprizar_industries

EXECUTIVE LIAISON
Niranjan Biswal (Executive Director)
CIN: U24103OD2025PTC051750